This is the Flying Robot Profect Team B, and we would like to share this week's progress.
Today, we first cut carbon pipes with a saw and continued with assembling the main wing with the joint parts made by the 3D printer: we marked where the ribs are attached to the pipes and temporarily fixed the ribs using masking tape. Using bamboo, we also made the framework of the tail wing. In the process, we were worried about the distortion in the rib in the main wing to which the tail wing will be connected with a carbon pipe. However, it was found that it is cleared when the carbon pipe is attached to the rib, securing its shape.
Next time, we are going to keep assembling the tail wing and start gluing the frameworks for the main wing and the tail wing.
飛行ロボットプロジェクトB班です。今週の進捗を共有させていただきます。
今日はまず初めに鋸を使ってカーボンパイプをカットし、前回に引き続き主翼を3Dプリンターで作った結合パーツを使って組み立て、リブが結合するところをカーボンパイプに印をつけ、マスキングテープでリブを仮止めしました。竹籤を使って尾翼の枠組みの作成も行いました。途中、尾翼がカーボンパイプで繋がっている主翼のリブが歪んでいることが気がかりでしたが、カーボンパイプが接着されていれば、補強されて真っ直ぐになることが分かりました。
次回は、尾翼の組み立てを続行し、翼の枠組みの接着を開始する予定です。

|