This week, Team B assembled the plane, attached electrical equipment, and conducted running test.
First, we attached the wings to a carbon pipe(which becomes the body), and then mounted the electrical equipment, such as battery, motors, and RC receiver. We had a difficulty in connecting servomotors with elevator and rudder, so we had to try it several times. It took pretty much time. After that, we attached a leg and tires, and we had a running test. It ran pretty well after some adjustments.
Next week, we are going to name the plane, and have a flight test.
今週、Bチームは組み立てと電装品の取り付け、走行試験を行いました。
まず翼を胴体となるカーボンパイプに接着し、バッテリーやモーター、ラジコン受信機などの電装品を取り付けました。サーボとエレベーターやラダーをうまく繋げるのが難しく、何回もやり直さなければならず、かなり時間がかかりました。その後脚とタイヤを取り付け、走行試験を行いました。多少の調整を加えると、良い走りを見せてくれました。
来週は飛行機を命名し、飛行試験を行う予定です。

|