|  | Today, due to the season when it’s easy to fall ill, only two people were able to attend the clas...December 25, 2024 | 
|  | Today, we attached Japanese paper (washi) to the main wings. To start, we divided the wing into t...December 25, 2024 | 
|  | During the previous work session, the trailing edge of the main wing broke due to insufficient co...December 18, 2024 | 
|  | This week, we made significant strides in constructing the framework for both wings of our flying...December 11, 2024 | 
|  | Today we worked on one of the main wings and the tail wing. For the main wings, we used the jigs ...December 11, 2024 | 
|  | This week, we worked on applying black washi paper to one side of the horizontal and vertical sta...December 04, 2024 | 
|  | Today, we attached Japanese paper (washi) to the tail assembly. To start, we covered the table wi...December 04, 2024 | 
|  | This week, we constructed the tail assembly. First, we created a CAD design of the tail, then pri...November 27, 2024 | 
|  | This time, we worked on assembling the tail unit using the full-scale design plans we had printed...November 20, 2024 | 
|  | Today, we cut out the ribs for the main wing using a Beambox Pro laser cutter. We began by import...November 20, 2024 | 
|  | We are Group A of the 2024 Academic Year, A Semester. First, we will explain the concept of our a...November 06, 2024 | 
|  | Today, we focused on the aircraft design and decided to adopt a V-tail configuration inspired by ...November 06, 2024 | 
|  | We configured the arm switch on the transmitter and verified that all four motors functioned corr...July 03, 2024 | 
|  | This week, we checked the operation of the rudder, elevator, and aileron. The rudder and elevator...July 03, 2024 | 
|  | This is the Flying Robot Profect Team B, and we would like to share this week's progress. Today, ...July 03, 2024 | 
|  | On 26 June, the seventh workday, we added diagonal elements to the upper and lower wings to incre...June 26, 2024 | 
|  | This is the Flying Robot Profect Team B, and we would like to share this week's progress. Today,...June 26, 2024 | 
|  | This week, we made the servo motor mounting parts, joined the left and right main wings, and full...June 26, 2024 | 
|  | On the sixth session on June 19th, we cut out the remaining parts of the main wings from balsa wo...June 19, 2024 | 
|  | This is the Flying Robot Project (2024S Semester) Team B, and we would like to share our progress...June 19, 2024 | 
|  | Today, although the four motors moved well last time, they did not today. Two of the motors moved...June 19, 2024 | 
|  | This week, we redesigned the joints between the left and right wings and the fuselage. First, the...June 19, 2024 | 
|  | On June 12, the fifth session, we assembled the part connecting the upper and lower wings to the ...June 12, 2024 | 
|  | This is the Flying Robot Project (2024S Semester) Team B, and we would like to share our progress...June 12, 2024 | 
|  | Today, we finished assembling the electrical components and started testing them. Some of the mot...June 12, 2024 | 
|  | This week, we proceeded with the fabrication of the aileron. The aileron spar is made of 3mm-diam...June 12, 2024 | 
|  | In the fourth production, we assembled the lower wing framework and installed the tape hinges for...June 05, 2024 | 
|  | This is the Flying Robot Project (2024S Semester) Team B, and we would like to share the progress...June 05, 2024 | 
|  | Today, we assembled the electrical components. First, we soldered a connector that connects the l...June 05, 2024 | 
|  | On May 29, the third session, we completed the framework of the horizontal tail fin and attached ...May 29, 2024 | 
|  | This is the Flying Robot Project (2024S Semester) Team B. We would like to share the progress rep...May 29, 2024 | 
|  | Today, we assembled our quadcopter, using the newly 3D-printed parts, redesigned based on the pro...May 29, 2024 | 
|  | This week, I first cleaned up the plank of the left wing. Taking great care not to damage the fla...May 29, 2024 | 
|  | In the second session on May 22, we applied washi paper to the vertical stabilizer that we had ma...May 22, 2024 | 
|  | This is the Flying Robot Project (2024S Semester) Team B. We would like to share the progress rep...May 22, 2024 | 
|  | Today, we checked the condition of a printed frame and confirmed the strength with torsion and st...May 22, 2024 | 
|  | There were two main tasks. The first was to make mounts for joining the fuselage and wings. After...May 22, 2024 | 
|  | Hello! In group A of the 2024 summer semester class, we decided to create a biplane capable of ae...May 08, 2024 | 
|  | We are the Flying Robot Project (2024S Semester) Team B. We would like to share the progress repo...May 08, 2024 | 
|  | Today, we gathered at the workshop to finalize the design of our own customized drone and borrowe...May 08, 2024 | 
|  | Our group is working on a Flying Wing aircraft. This week, we worked on everything from cutting ...May 08, 2024 | 
|  | Our aircraft is a T-tail with ailerons, a rudder, and an elevator. We have only built elevator an...May 08, 2024 | 
|  | This week, group C shaped both wings and cut out the excess parts for joining. First, we worked o...January 17, 2024 | 
|  | This week, Group D continuously proceeded with both the software and the body of the multicopter....January 10, 2024 | 
|  | This week, Team C completed one wing and started working on the other. The first task was to conn...January 10, 2024 | 
|  | This week, Group D proceeded with making the multicopter itself and operating the software. As...December 27, 2023 | 
|  | This week, Team C split into teams of two and one to install the planks and cut out the ribs on t...December 27, 2023 | 
|  | This is Team A of the Flying Robot Project (2023A Semester), and we would like to provide a progr...December 20, 2023 | 
|  | This week, Group D committed ourselves to making the body of the multicopter. First, we made th...December 20, 2023 | 
|  | "This week, team B started working on the main wing section. The balsa materials were cut last w...December 20, 2023 | 
|  | This week, Team C installed the planks. Last week, the cut-out ribs were fixed to the plans with...December 20, 2023 | 
|  | This week, Group D continued working on the multicopter’s leg. We have almost finished laser-cut...December 13, 2023 | 
|  | This week, our Team C was divided into groups of two and one person, each responsible for assembl...December 13, 2023 | 
|  | Today we began making the horizontal tail wing of the flying robot. We followed the same procedur...December 13, 2023 | 
|  | This week in Team C, we made progress on our project to build a fully-winged aircraft, as seen in...December 06, 2023 | 
|  | Team D is making a multicopter with four propellers for vertical movement and two propellers for ...December 06, 2023 | 
|  | This week, Team B successfully constructed the vertical tail fin. However, for the first experime...December 06, 2023 | 
|  | This is the Flying Robot Project (2023A Semester) Team A. We would like to share the progress rep...December 06, 2023 | 
|  | This week, the group continued to work on the main wings and stabilisers as per usual. The member...June 28, 2023 | 
|  | I am Yuito Izumi, a first-year student in the College of Liberal Arts, Science I, and I am in cha...June 28, 2023 | 
|  | This week we mainly connected electrical devices with conductors. We bundled several conductors w...June 28, 2023 | 
|  | This week Group A continued to work on the main wing and tail wing at the same time as last week....June 21, 2023 | 
|  | This week we connected the PIXHAWK controller to the receiver and motors using the electronic spe...June 21, 2023 | 
|  | We have completed the process of creating a 3D CAD model of the wing and converting it into a for...June 21, 2023 | 
|  | This week, work was divided into two groups: members working on the main wings and members workin...June 14, 2023 | 
|  | One of the members was absent this week due to illness. With three members working together, it w...June 14, 2023 | 
|  | This week we reviewed and modified the structure of the center section of an all-wing aircraft. T...June 14, 2023 | 
|  | I am Yuito Izumi, a first-year student in the College of Liberal Arts, Science I, and I am in cha...June 14, 2023 | 
|  | This week, we started constructing the main wing using the ribs we cut out from the 3mm thick bal...June 07, 2023 | 
|  | This is Alvin Praet, a third-year student of the faculty of Engineering Systems Innovation, who i...June 07, 2023 | 
|  | Today we cut and glued balsa plates and cut carbon pipes. We also confirmed the assembly procedur...June 07, 2023 | 
|  | This time, we finally determined the center of gravity, and the positions of the motor and batter...June 07, 2023 | 
|  | Today, we used the laser cutter to cut the airfoil and other parts from balsa wood based on the b...May 31, 2023 | 
|  | Continuing from last week’s work, we assembled the framework for the horizontal and vertical tail...May 31, 2023 | 
|  | Today, we assembled the machine based on the blueprint we designed in CAD. Our machine consists o...May 31, 2023 | 
|  | We are working on drone production as Group D. The other groups have six members, but our group h...May 24, 2023 | 
|  | The general shapes of the main wings, horizontal stabilizers, and vertical stabilizer were determ...May 24, 2023 | 
|  | My name is Alvin Praet and I am a 3rd year engineering student reporting for group C. Our airplan...May 24, 2023 | 
|  | Our group is designing an all-wing aircraft. This time, we reviewed the design. In the original a...May 24, 2023 | 
|  | In this class, I made the vertical tail fin, Nanako made the horizontal tail fin, and Atsushi use...December 22, 2021 | 
|  | In this activity, we made a cable to connect one T-connecter (male) to six ESCs. Our hexacopte...December 22, 2021 | 
|  | This week, we worked on the vertical tail wing, horizontal tail wing, fuselage, and main wing in ...December 15, 2021 | 
|  | Our group made the main wing and tail. Atsushi used the laser cutter and cut the balsa parts of...December 15, 2021 | 
|  | In this class, we installed and soldered the motor and feet. One of the ingenious things we did w...December 15, 2021 | 
|  | The main thing we were able to do today was cut out the ribs. We have been working on the structu...December 15, 2021 | 
|  | Today, we had several tasks going on at the same time. First, the vertical tail fin framework...December 01, 2021 | 
|  | This week, our group started making the frame. The first thing we did was to cut the carbon pipe ...December 01, 2021 | 
|  | Continuing from last week, we completed the main structure of our multicopter, which consists of ...December 01, 2021 | 
|  | Today, we started our work in the lab. We decided to make horizontal and vertical tail fins firs...December 01, 2021 | 
|  | Today we mainly worked on the skeleton of the vertical tail fin. Since our team only has first ye...November 24, 2021 | 
|  | Our group was divided into two groups to work on the project. Nanako worked on the electrical com...November 24, 2021 | 
|  | This time we assembled the body of the hexacopter. We used a laser cutter to cut out the balsa wo...November 24, 2021 | 
|  | Nice to meet you, I am Goto, a freshman. On this day, I finished the tail wing that I made last t...November 24, 2021 | 
|  | Since we had finished putting films on upper and lower parts of the main wings before, in the las...July 19, 2021 | 
|  | Our group almost completed the assembly of the aircraft this time. At first, we removed the jig f...July 14, 2021 | 
|  | We started applying the film to the upper and lower wings of the main wings. This work was more d...July 07, 2021 | 
|  | This week, we assembled the remaining half of the main wing and assembled the main wing together....July 07, 2021 | 
|  | This time we created ribs used in the center. While we make most ribs of balsa wood, we make ribs...June 30, 2021 | 
|  | We started by soldering the ESC and the motor together, which went much faster than last week, pr...June 30, 2021 | 
|  | June is over in an instant. This is Kikuchi. Today we assembled the tail wing and curved wing. I...June 30, 2021 | 
|  | Today, we finished cutting out ribs and jigs by laser cutter and cutting off foamed styrol for th...June 30, 2021 | 
|  | Continuing from last week, our team made the body and the main wing this week. The body is like a...June 30, 2021 | 
|  | These days in Japan, it is a rainy season called "Tsuyu." Balsa wood easily burns in laser cutter...June 23, 2021 | 
|  | This time we created ribs used in the center. While we make most of ribs of balsa wood, we make r...June 23, 2021 | 
|  | We started by soldering the ESC and the motor together, which went much faster than last week, pr...June 23, 2021 | 
|  | Continuing from last week, our team made the body and the main wing this week. The body is like a...June 23, 2021 | 
|  | Continuing from last week, our team made the body and the main wing this week. The body is like a...June 23, 2021 | 
|  | We made frame structure of upper and lower wings of a circular wing. Then, leading edge of upper ...June 19, 2021 | 
|  | This week, our team started building the tail assembly. We first printed out the full-scale tail ...June 16, 2021 | 
|  | "Spring is Akebono, the world is Nasake, walking like the Mogami River. How are you doing in earl...June 16, 2021 | 
|  | This week, we make the main wings and ailerons of balsa wood and put together the main wings and ...June 16, 2021 | 
|  | There are three main things we did this week. First, we cut black paper according to the full-sca...June 16, 2021 | 
|  | Hi, we are netfoth-2, and we are working on the flying robot project. The name netfoth-2 is an a...June 15, 2021 | 
|  | This week we completed the detailed design of the structure. The original plan was to place the ...June 09, 2021 | 
|  | Since we lost the race in using the laser cutter, we continued with looking at the Pixracer and Q...June 09, 2021 | 
|  | We have decided to build a flying wing aircraft. By last week, we have completed the aerodynamic...June 02, 2021 | 
|  | This week, we worked on learning how to set up Pixracer on the computer. As it was the first time...June 02, 2021 | 
|  | This week, we modified the trihedral figure including structure based on the advice we received l...May 26, 2021 | 
|  | The team name is BJ-ron, where BJ comes from “Black Jack” a manga one teammate like, and “ron” fr...May 26, 2021 | 
|  | Our group had determined to create a BWB(Blended Wing Body) aircraft. Most of us didn’t know much...May 19, 2021 | 
|  | This week, basic team made a trihedral figure including structure of airframe. Last time, we rec...May 19, 2021 | 
|  | The main things we did this week were to improve the design of the aircraft using 3D CAD, choose ...May 19, 2021 | 
|  | We, team Biplane (a tentative name) plan to make a ring-shaped wing because it produces stronger ...May 18, 2021 | 
|  | We are going to make a tail-sitter aircraft (VTOL). It might be difficult to make VTOL, but we ho...May 17, 2021 | 
|  | This week, Team B assembled the plane, attached electrical equipment, and conducted running test....December 03, 2020 | 
|  | This week, we made linkage and wheels, and finally completed our aircraft, Yukigake. We checked ...November 30, 2020 | 
|  | We were able to complete to assemble almost all the parts of our plane this week. There are stil...November 23, 2020 | 
|  | This Saturday, we put propellers on the multicopter and it actually fly . But on Sunday, for var...November 22, 2020 | 
|  | This week we redesigned the aileron and vertical stabilizer. Also, after assembling the ribs on t...November 21, 2020 | 
|  | We began to make the main wing using the jig we made last week. The ribs of the main wing were pr...November 19, 2020 | 
|  | This week, Team B made tail wings. Also we connected upper wings and lower wings with struts. It...November 18, 2020 | 
|  | On November 14 and 15, we decided the placements of the parts. We had to consider interference of...November 15, 2020 | 
|  | From this week, we have started making an actual machine at Faculty of Engineering Building No.1...November 12, 2020 | 
|  | This week, Team B made the tail wing. The original plan was to make the tail frame 5mm in thick, ...November 10, 2020 | 
|  | This week we discussed the selection of components and the aircraft design. We checked the weight...November 10, 2020 | 
|  | Before we set about making airplane body, we were first instructed in how to use a laser-beam pri...November 08, 2020 | 
|  | This week, Team A has almost finalized the structure of the multicopter. If we make the whole bod...November 05, 2020 | 
|  | This week, we discussed how to protect electrical components from water and the shape of legs. We...November 04, 2020 | 
|  | This week we talked about more detailed aircraft design, parts selection and manufacturing proces...November 04, 2020 | 
|  | At the beginning, we modified our trihedral drawing since it was pointed that aspect ratio was to...October 31, 2020 | 
|  | This week, Team B produced a detailed blueprint. We decided the specific structure of the main an...October 29, 2020 | 
|  | This week we decided what kind of multicopter we will produce. We are going to make a simple quad...October 28, 2020 | 
|  | Our group, Team B, has decided to make a biplane. This week, we decided the specifications of the...October 28, 2020 | 
|  | The member of teamA is Daiki Sawa and Ryousuke Takayama. And Mr. Kim is instructing us. This week...October 28, 2020 | 
|  | Group C is going to make a flying wing aircraft. This week, we decided a wing shape and an airf...October 26, 2020 | 
|  | We(group D) decided to make a hydroplane. However, we do not have any place for the plane to take...October 25, 2020 | 
|  | We started by soldering the ESC and the motor together, which went much faster than last week, pr...June 30, 2020 | 
|  | Our group, Group A, has decided to make an all-wing aircraft. The all-wing aircraft has the compl...February 05, 2020 | 
|  | In the previous plan, we wanted to make a new drone body part slightly larger than the existing d...January 15, 2020 | 
|  | Our group, Group A, has decided to make an all-wing aircraft. The all-wing aircraft has the compl...January 08, 2020 | 
|  | Our group, Group A, has decided to make an all-wing aircraft. The all-wing aircraft has the compl...December 18, 2019 | 
|  | This week, we made a good progress both in making the body and in the control methods. First, fo...December 15, 2019 | 
|  | From today, we started to code our programs for controlling the aircraft. Since we decided to uti...December 12, 2019 | 
|  | Today, after assembling the propeller, programming was set up so that the propeller responds to p...December 11, 2019 | 
|  | Last time, we would plan to connect the propeller junction, which is to be produced with a 3D pri...December 11, 2019 | 
|  | Our group, Group A, has decided to make an all-wing aircraft. The all-wing aircraft has the compl...December 11, 2019 | 
|  | Hello, I’m Kenta Tanada, a member of group D of flying robot project in 2019 autumn. In this wee...December 10, 2019 | 
|  | This week, we assembled a balsa that was part of the Magnus mechanism. In order to create a str...December 04, 2019 | 
|  | 今週は機体製作と制御の両方でかなりの進歩があった。 まず、機体製作では、当初から行なっていた3次元構造設計に誤りがあったので、全体を大幅に見直した。まず、キャンバーの厚みが薄く強度不足が懸念さ...December 04, 2019 | 
|  | This time using a laser cutter, I cut out parts of the Magnus mechanism and tail parts (circle, r...November 20, 2019 | 
|  | In the last meeting, we were going to create a protector for the propeller by using veneer and ma...November 20, 2019 | 
|  | Today, we received our parts and the flight controller team discussed what program we should make...November 20, 2019 | 
|  | This week, we originally planned to make a circuit and code for reading S-BUS. However, only aft...November 20, 2019 | 
|  | This time, we made a drone body by cutting the balsa plate with a laser cutter and purchased a mo...November 17, 2019 | 
|  | Today's main task was to master how to use 3D printers and laser cutters. In the meeting held las...November 13, 2019 | 
|  | Hello, I’m Take Okamoto, from group D of flying robot project 2019 autumn. In today’s class, we h...November 06, 2019 | 
|  | We are taking this course again to complete building Sierra, the plane we are making since the la...November 05, 2019 | 
|  | Making the Flying Robot report Group A, Takumi Endo, November 5 Our group, Group A, has decid...November 05, 2019 | 
|  | Hello, I'm Masaya Ido, from group D of flying robot project 2019autumn. We are going to build an ...October 31, 2019 | 
|  | Last week, we divided our team member of five into a body production team and a control team. And...October 30, 2019 | 
|  | Our group wants to make an interesting plane, so we decided to make the one which is uses the the...October 30, 2019 | 
|  | Hello, I'm K form team E. This time we made all the parts set. Picture shows the completed plan...July 24, 2019 | 
|  | We conducted our first flight test for our plane. We were excited that we will finally were able ...July 24, 2019 | 
|  | Last time we calculated the position of the center of gravity and attached the main winds and the...July 17, 2019 | 
|  | Today, our team continued to produce the drone part. The size of the drone was a relatively larg...July 10, 2019 | 
|  | We held a regular meeting for flying robot and did three main works on July 10th. The first is as...July 10, 2019 | 
|  | In the class, we made the connection part of the frame. In the last class, main bodies were made....July 10, 2019 | 
|  | We are still working on the gravity center adjustment device (GCAD). The main parts of GCAD were ...July 03, 2019 | 
|  | We couldn’t finish soldering in the last time, so we continued doing it in this time. Basicall...July 03, 2019 | 
|  | Today, our team continued to product the drone part. The size of the drone was a relatively larg...July 03, 2019 | 
|  | Last week, we could successfully control a servo motor, but we didn't use the remote controller t...July 03, 2019 | 
|  | Hello, We are team E Because I intended to do a flight test this time,I installed the all equipm...June 26, 2019 | 
|  | In today’s class, we attached two servos for rudders to wing tips and attached landing gears to t...June 26, 2019 | 
|  | This week, we assembled the main wing. We connected the wings that we finished last week with som...June 26, 2019 | 
|  | We worked on the pitching balance device, which is one of the most characteristic points of our a...June 26, 2019 | 
|  | We couldn’t finish soldering in time during last class, so we continued doing it in this class ti...June 26, 2019 | 
|  | We worked on the pitching balance device, which is one of the characteristics of our aircraft. Yo...June 26, 2019 | 
|  | This is team A. And we want to report our plan progressing this week.This week, we did two main t...June 19, 2019 | 
|  | Hello, we are team B. This week, our group mainly assembled the parts we have made. First, we cu...June 19, 2019 | 
|  | We are group D. This time, we worked on bones and structures of our airplane. Since we are going ...June 19, 2019 | 
|  | We are group D. This time, we worked on the structures of our airplane. Since we are going to mak...June 19, 2019 | 
|  | We held a regular meeting for flying robot and did two main works on June 19th. One is extension ...June 16, 2019 | 
|  | We are team B of Flying Robot Project 2019 and making a double-wing aircraft which uses ailerons ...June 12, 2019 | 
|  | Last week, we confirmed the rotation of motors and the connection of the circuits. The next thi...June 12, 2019 | 
|  | This week, we finally finished procuring all the necessary parts and started on the last phase of...June 12, 2019 | 
|  | Although we'd thought that we can fly our aircraft, we couldn't finish all of our tasks. However,...June 12, 2019 | 
|  | One of the most challenging parts of our work is to create a device for adjustment of the plane's...June 12, 2019 | 
|  | Last week, we finished creating two pairs of tail assembly and one pair of main wings. Thanks to ...June 12, 2019 | 
|  | We started PX4 setting this week. PX4 is a well-developed software/hardware for automated flying...June 05, 2019 | 
|  | We, team C, almost completed the structure of our airplane. Since our plane has ring-wing, insert...June 05, 2019 | 
|  | This week we teamA have completed building the main wings and assembly of two sets of tail wings....June 05, 2019 | 
|  | This week, we changed the designs of ribs and reinforcements before the class. During the...June 05, 2019 | 
|  | Hello, I'm K from team E. Let me tell you team E's progress from last week. Mr. H set papers o...June 05, 2019 | 
|  | This week, We worked on wing structure and motor mounting.Right wing structure which we have made...June 05, 2019 | 
|  | In the last class, a power module was broken and we couldn’t fix it. We ordered a new one at an ...June 05, 2019 | 
|  | Until the previous class, we had already completed the basic structure of each wing, but other mo...May 29, 2019 | 
|  | We made 2 groups. One group was in charge of main wing and the other group was in charge of tail ...May 29, 2019 | 
|  | We had the 5th meeting on May 31, 2019. This article describe how our team is going on and small ...May 29, 2019 | 
|  | Our team is trying to create a hybrid of a quadcopter and a fixed wing airplane. Therefore, we de...May 29, 2019 | 
|  | In today’s class, we designed and made reinforcing elements, elevons and vertical stabilizers. ...May 29, 2019 | 
|  | Hi, I would like to talk about team E’s Progress. Our plane S.K.H.Q. has a twisted thin wing with...May 22, 2019 | 
|  | I modified a part of the three-dimensional structure created last week. We discussed how to cre...May 22, 2019 | 
|  | Today, we continued soldering of connectors and the design of the drone body. The connector was m...May 22, 2019 | 
|  | This week, we began to cut out the parts and build the plane, from the plans and concept designs....May 22, 2019 | 
|  | We are team B of Flying Robot Project 2019 and making a double-wing aircraft which uses ailerons ...May 22, 2019 | 
|  | Continuing from last week, we made our prototype of the airplane. Last week, we cut styrene boar...May 22, 2019 | 
|  | Last week,our team made some parts of the tail assembly and a pair of supports which help us maki...May 22, 2019 | 
|  | This day was the first day we started actual construction work for making our flying robot. The ...May 15, 2019 | 
|  | We mainly did three things this week. First, we checked the calculation we did in the past. We...May 15, 2019 | 
|  | This week, the first thing we did was to make a shopping list. 2x [servo] EMAX ES09A 2x [serv...May 15, 2019 | 
|  | Last week, we made all parts in our aircraft's tale assembly. Then we started making the main win...May 15, 2019 | 
|  | Based on the three-dimensional structure created last week, we started making aircraft prototype...May 15, 2019 | 
|  | Last week, our team designed structure of our aircraft. Our team is going to participate in the“...May 08, 2019 | 
|  | Hello, I would like to introduce our team E‘s airplane, “S.K.H.Q. “.We will be challenging on a ...May 08, 2019 | 
|  | We are team D and we are going to make a airplane that consists of multi copters and fixed wings...May 08, 2019 | 
|  | According to the comments from a teaching assistant regarding the construction plan which we sub...May 08, 2019 | 
|  | At the 2nd meeting, four main works were proceeded which were including design, research and disc...May 08, 2019 | 
|  | Report from Team F, Apr. 24th Three members of the team exchanged their ideas of the aircraft ...April 24, 2019 | 
|  | In today’s class, we were grouped into teams and each team decided the concept of the aircraft. O...April 24, 2019 | 
|  | Hello, we are team B for the summer semester 2019. We have six team members, one junior (major i...April 24, 2019 | 
|  | This week, we were divided into groups. We talked about what kind of plane we would like to make,...April 24, 2019 | 
|  | Today, we discussed what type of flying robot we will be making. Our team wanted to make a flyin...April 24, 2019 | 
|  | The update of the blog post was delayed due to busy for a while, but the flapping machine was com...February 06, 2019 | 
|  | Last our activity gave us a supposition that birds would get not lift but thrust by flapping. Our...December 12, 2018 | 
|  | Design Concept Our team decided to create a machine which flies by its wings flapping like a bi...December 12, 2018 | 
|  | Today, our team tried using a laser cutter and a 3D printer. When we used the laser cutter befor...November 28, 2018 | 
|  | This week, our team made ribs and two main landing gears of an airplane. We decided to use EPP(e...December 12, 2018 | 
|  | Last week, we make two vertical tail wings and a horizontal tail wing. As you know, the aircraft ...December 05, 2018 | 
|  | We decided to make a twin-boom model airplane with a pusher configuration. A pusher configuratio...November 28, 2018 | 
|  | In the last class, we assembled the frame of our drone. We used carbon pipes and white joints ma...December 12, 2018 | 
|  | Our team has been making octocopter. Last week, we assembled CFRP pipes and PLA joints into outer...December 05, 2018 | 
|  | In this class, our team are creating an octocopter. Today we made some joints with 3D printer whi...November 28, 2018 | 
|  | Our drone’s concept is that “to be free to rotate in any direction in the air”. The body has a r...November 21, 2018 | 
|  | Today was the first flying test. To make the long story short, our robot did not fly. This was be...July 27, 2018 | 
|  | We change its electronic central control system (ECCS) with a new one. As changing its ECCS, we s...July 11, 2018 | 
|  | This week, we have worked to connect the main wing, horizontal stabilizer, vertical stabilizer an...July 11, 2018 | 
|  | This week the other wing was fitted with the same poly-carbonate sheet cover as well. The cover w...July 11, 2018 | 
|  | We built the structure of the drone, and its electric components. However, one of its motors did ...July 04, 2018 | 
|  | Hello, this is Yokomura of Group B. Our group is working on the production aiming for a stylish d...July 04, 2018 | 
|  | 4 July report Today we worked on main wing and wiring cables of motors. 2 of us made main wing an...July 04, 2018 | 
|  | This week we added forward portion of covering material for the wing. The covering is made from t...July 04, 2018 | 
|  | This month, we have brought our flight model airplane to completion. This airplane was designed t...June 27, 2018 | 
|  | Our team bought the thick Balsa wood from Tokyu Hands. We made the wings by laser. We also made t...June 27, 2018 | 
|  | Today, we concentrated on making our drone’s body, because the controlling team, which use softwa...June 27, 2018 | 
|  | This week, we firstly decided how to connect the rudder to the vertical stabilizer. At first, we ...June 27, 2018 | 
|  | On June 27, we were able to bring the fixed wing aircraft part closer to completion. He made up t...June 27, 2018 | 
|  | This week additional wing was assembled using parts created in previous weeks. The faulty body fr...June 27, 2018 | 
|  | This week we mainly focused on cutting out balsa wood and checking the circuit. At very first sta...June 20, 2018 | 
|  | This week, all parts required for wings were completed. This means that all the ribs were cut usi...June 20, 2018 | 
|  | Our ‘Designing’ Team has already completed making the multicopter. Next week, we are going to con...June 20, 2018 | 
|  | Today, we finally finished making a half of the main wing. We thought that it would take very lon...June 20, 2018 | 
|  | Hi, I’m Ogishi. This week, we, group A, finally began making a prototype of our drone. People in ...June 13, 2018 | 
|  | Last week, we completely making the main wings. Please look at this picture (picture 1). I think ...June 13, 2018 | 
|  | The overall concept has been decided so far, but we didn’t decide concrete shape of the parts, an...June 13, 2018 | 
|  | This week, all the ribs were reinforced, and the assembly for drag rudder and elevon began. The i...June 13, 2018 | 
|  | Our aime in this week was to completing main part of our plane's body(including the wing, tail an...June 13, 2018 | 
|  | Body making section of our team cut out body from plywood, using laser printer. Our first plan wa...June 06, 2018 | 
|  | Our team aims at creating one aircraft with which something can be brought from one point to a de...June 06, 2018 | 
|  | This week, carbon fiber reinforced plastic rod, which will act like one of the spars to hold all ...June 06, 2018 | 
|  | Today, our team mainly did two things. We made a big progress on the structure of the horizontal ...May 30, 2018 | 
|  | This time we started to make the horizontal tail using balsa timbers. This photo is the scene I t...May 23, 2018 | 
|  | This week, we have finished building our first flight model and started the test flight with a ma...May 23, 2018 | 
|  | The Pixracer, which is the main controller of our drone had arrived, and this day was the first ...May 23, 2018 | 
|  | We finished the vertical tail, the horizontal tail . The horizontal tail was nearly complete in t...May 23, 2018 | 
|  | The goal of our team consists of mainly two factors. The first is to enable the drone to catch a ...May 23, 2018 | 
|  | 23 May Report Today, we worked on the main wing. In before class we started to make it, but we we...May 23, 2018 | 
|  | Today, we started to assemble parts of our plane wings. We made the parts we cut from balsa sheet...May 23, 2018 | 
|  | Our group gathered for the third time this week. Our homework for this week was to decide the air...May 16, 2018 | 
|  | Hello there. I’m Ogishi, a member of group-A in the Flying Robot Project. On the night of May 16,...May 16, 2018 | 
|  | Today we have completed the first version of our elevator and rudder. We were all very excited be...May 16, 2018 | 
|  | This week, we started to produce the ribs from balsa wood board. An entire wing was modeled using...May 16, 2018 | 
|  | In the last week’s activity, our team found that the strength of the structure was lacking to hol...May 09, 2018 | 
|  | This week, we have assembled our aircraft. The airplane on the right side of this picture is the ...May 09, 2018 | 
|  | Let us start today’s briefing with this picture of a TRAGEDY that has fallen upon the piece we ma...May 09, 2018 | 
|  | Last week, We decided the structure and material of the flying robot's framework concretely, so w...May 09, 2018 | 
|  | This week, the structural 3-dimentional diagram for our plane was completed. Adjustment based on ...May 09, 2018 | 
|  | Hi, my name is Matsuura. I will report the progress of today’s meeting. In previous class, we dis...May 02, 2018 | 
|  | Based on the meeting about the design of our model, we have created the model with CAD software b...May 02, 2018 | 
|  | This week, we specifically designed the folding and unfolding mechanism of the airframe. After in...May 02, 2018 | 
|  | This time we discussed the specific structure of the plane. It was necessary to change some point...May 02, 2018 | 
|  | Today our team discussed our blueprint with our TAs. Our wing structure is going to be VERY stron...May 02, 2018 | 
|  | Today our team discussed our blueprint with our TAs. Our wing structure is going to be VERY stron...May 02, 2018 | 
|  | The biggest goal of group A is to make multicopter capable of winning the Flying Robot Competitio...April 25, 2018 | 
|  | Last week’s lesson was the third one of Flying Robots course and we started to make our flying ro...April 25, 2018 | 
|  | Diary: Designing our aircraft and determining details 18/04/25 On April 25, largely we did two ta...April 25, 2018 | 
|  | Hello, this is G team in the Tokyo University’s class in which we try to make flying robots. At f...April 25, 2018 | 
|  | Up to now, main components of the aircraft are almost finished. Today, each member engaged in dif...December 13, 2017 | 
|  | On December 6, we almost finished assembling the main wing, even though the ailerons must be atta...December 06, 2017 | 
|  | 4 millimeter square carbon pipes had arrive and we started working on the wings. We chose square ...November 29, 2017 | 
|  | As ordered parts had not yet arrived, we worked on other parts. We finished cutting ribs and wing...November 22, 2017 | 
|  | This week we wrote aircraft blueprint with a CAD software. We got used to using the new software....November 08, 2017 | 
|  | On November 8th, the team moved on to begin the wing construction. With the prior week's wing des...November 08, 2017 | 
|  | On November 1st, we started the session by closing out the remaining construction of the horizont...November 01, 2017 | 
|  | This week we wrote the aircraft blueprint with a CAD software. We will make parts of the aircraft...November 01, 2017 | 
|  | As a business model by using drones, I suggested a cleaning agency of windows of buildings and ap...October 25, 2017 | 
|  | After spending a few weeks planning the structure of the plane, we began to actually build the fr...October 25, 2017 | 
|  | This week we designed the detailed structure of our plane. Each member drew drafts based on the i...October 18, 2017 | 
|  | We created a plan for the Multicopter. We will create the Multicopter for sport.We will set the M...October 18, 2017 | 
|  | First we finished things undone, leading edge, trailing edge and fin. We chose hinoki as material...July 05, 2017 | 
|  | We continued on constructing wings. To reinforce them, we added gusset plates on intersection poi...June 28, 2017 | 
|  | We heve started working on the lower wing this time.However it was unexpectedly difficult to atta...June 28, 2017 | 
|  | We continue to work on the circuit parts and the body. About camera, we have trouble controlli...June 28, 2017 | 
|  | This week we started constructing wings. We almost finished constructing right wing. It was very...June 21, 2017 | 
|  | This week, we performed an operation check of a camera module. Using an oscilloscope, we were sur...June 21, 2017 | 
|  | This week we made the main wing. We glued the left wing and the right wing together, and we cover...June 21, 2017 | 
|  | Progress this week 1) Attached the wing, vertical/horizontal tail wing, and rotor mount to the f...June 14, 2017 | 
|  | This week we continued on making components. Because of troubles, for example the component we d...June 14, 2017 | 
|  | We have started to make the parts out of veneers using the laser cutter. We have ordered motors ...June 14, 2017 | 
|  | Progress this week 1) Finished making adjustments to the wing to make it detachable (Fig 1.) 2)...June 07, 2017 | 
|  | This week we started making components with laser cutter and 3d printer. We gradually learned how...June 07, 2017 | 
|  | We cut down some parts from balsa wood with laser cutter. Any parts had not reached us yet, so w...June 07, 2017 | 
|  | Progress this week 1) Wrapping the tail wings with thin sheet of paper 2) 3-D print the mount f...May 31, 2017 | 
|  | This week, we finished making the frames of the stabilizers, the elevator, and the rudder. And we...May 31, 2017 | 
|  | This week we planned to cut components, but we couldn't finish it because of trouble in draft fil...May 31, 2017 | 
|  | Progress this week 1) Made the 2nd draft of the blueprint (revised the airfoil ribs and attachme...May 24, 2017 | 
|  | This week we discussed detail drawings. Since we don't plan to entry flying robot contest, we don...May 24, 2017 | 
|  | This week, we considered parts of the multicopter moreover. We found that the thrust of the motor...May 24, 2017 | 
|  | Our concept is a tail-sitter aircraft (vertical takeoff and landing aircraft or VTOL aircraft) wi...May 17, 2017 | 
|  | This week we decide concept of our robot,and make a draft of the robot. We plan to make fixed-wi...May 17, 2017 | 
|  | Based on the concept of structural strength and good looks, we decided to make biplane aircraft a...May 17, 2017 | 
|  | This week we drew 初期三面図. All of us don't have experience in making models, and thought it to be a...May 17, 2017 | 
|  | I’m Watanabe Takafumi, a member of the Team A. The Team A is going to take part in the 2017 Flyin...May 17, 2017 | 
|  | This week, we finished making electrical circuit. We need more test because this circuit is somew...January 18, 2017 | 
|  | This week our team finished making our plane. We repaired the damage caused by the last flight,...January 11, 2017 | 
|  | This week, we started cutting of quadcopter's frame. We already finished 2D-design and using laze...December 21, 2016 | 
|  | This week, we made the structures to move the elevators or rudders and cut balsa wood to make the...December 21, 2016 | 
|  | Last week we discussed the aileron linkage but we did not have enough time and we decided to fly...December 21, 2016 | 
|  | [Activities of last week] Last week we did the following: Adhered the tail wings Attached a ...December 21, 2016 | 
|  | We succeeded to move 9 axis sensor (MPU - 9250) with mbed. Data in the image was obtained at res...December 14, 2016 | 
|  | [Work of this week] We cut carbon sticks to use for plane body or rotation axis of the main win...December 14, 2016 | 
|  | This week, we designed a part to mount the circuit board. We also soldered the electronic compon...December 14, 2016 | 
|  | [Activities of last week] Last week we did the following: Installed the ladder and the elevat...December 14, 2016 | 
|  | This week our team modified the main wing, and made a prototype of the electric circuit that sha...December 07, 2016 | 
|  | [Activities of last week] Last week we did the following: Pasted paper on the main wing Cond...December 07, 2016 | 
|  | 【Programming】 We succeeded to read the acceleration and gyro sensor value without the library we...November 30, 2016 | 
|  | [Activities of last week] Last week I did the following: Made the flap framework, pasted pape...November 30, 2016 | 
|  | We made most part of sennsor program this week and we will test this program next week. Some elec...November 23, 2016 | 
|  | Last week the main wing was almost completed, but twisting both ends of it we discovered that the...November 23, 2016 | 
|  | This week, we started detailed design of hardware and software programing. Quadcopter has a compl...November 16, 2016 | 
|  | We started to design the ribs. We got the coordinate data of the airfoil, dotted and joined the p...November 16, 2016 | 
|  | This week our team continued making the main wing. We put in the trailing edge and the other di...November 16, 2016 | 
|  | [Activity of last week] We did following things in last week. Bond stringers. Check assembly...November 16, 2016 | 
|  | This week, we made horizontal tail. Our horizontal tail is flat plate wing, so we can make the ta...November 09, 2016 | 
|  | 【Work of the week】 Cutting out ribs of main wings by laser-cutter. Attaching a part of ribs to ...November 09, 2016 | 
|  | [Activity of last week] We did following things in last week. Start making frame of the verti...November 09, 2016 | 
|  | The main point of making a quadcopter is programming. This time we tried to write a program to ...November 02, 2016 | 
|  | This week, we almost completed making the tail wings. Also, we started making components of main ...November 02, 2016 | 
|  | [Activity of last week] We did following things in last week. Complete detail designing of th...November 02, 2016 | 
|  | The concept of Team D is to make a quadcopter which mounts a camera. In this week we made a initi...October 26, 2016 | 
|  | 【Outline】 I would like to start on with some explanation of the outline of our plane. We are pla...October 26, 2016 | 
|  | Our team has been discussing about our model plane since the last class was over. Based on the r...October 26, 2016 | 
|  | [Introduction] Our team, team A intend to improve Kyutan, the flying robot we made last year, in...October 26, 2016 | 
|  |  | 
|  | This week, we completed the 3rd plane. It was needed to make a drop system for an airdrop mission...August 05, 2016 | 
|  | This week, we engaged in making the 3rd airplane. In this time, we changed both the wing and bod...July 29, 2016 | 
|  | This week, we made the second prototype. We changed the main wing completely. The features of the...July 23, 2016 | 
|  | July 13, 2016 | 
|  | [Summary of a weekly work] We have been making efforts to improve the performance of infrared (I...July 13, 2016 | 
|  | We are continuing developing our autonomous control system. For computation, we use a microcontro...June 08, 2016 | 
|  | [Summary of this week] In this week, we completely made our plane. Our plane’s weak point was th...June 01, 2016 | 
|  | [Summary of a weekly work] We have been testing IR sensors and making the frame of the aircraft ...May 25, 2016 | 
|  | Summary of weekly works We assembled an infrared (IR) projector for IR guidance system, and te...May 18, 2016 | 
|  | In last two weeks, we made 3d model of our flying robot and discussed the detail structure. Our f...May 11, 2016 | 
|  | [Summary of a weekly work] Last week our team studied how to achieve implementation of autopilot...May 04, 2016 | 
|  | [Summary of weekly work] We made an initial three-view layout and determine the specification. ...April 27, 2016 | 
|  | Last week our aircraft was hard to turn left and couldn't fly stably in the 1st test flight. The ...July 13, 2016 | 
|  | In this week we completed building our plane. On the day before the test flight we finished maki...July 13, 2016 | 
|  | This week, we almost completed making our plane. Also, we finished testing our autopilot system. ...July 06, 2016 | 
|  | This week what we first did was fixing the main wing of our plane. Last week we accidentally brok...June 30, 2016 | 
|  | This week we mainly made main wings and fuselage-wing connection parts. As you can see from the p...June 22, 2016 | 
|  | This week, we almost completed making the framework of the main wings. Also, we finished making t...June 15, 2016 | 
|  | This week we began to make main wing of our plane. Because our main wing is gull wing we had to c...June 08, 2016 | 
|  | This week we finished making the most of the empennage of our plane. The empennage will be compl...June 01, 2016 | 
|  | This week we have a meeting based on feedback from teaching assistants. The contents of the meet...May 25, 2016 | 
|  | This week our team made a first draft of the construction drawing for our model plane. Last week...May 18, 2016 | 
|  | This week our team made a third draft of the 3-view drawing for our plane. Last week we made a ma...May 11, 2016 | 
|  | This week, we rewrote our initial three-view drawing of the plane with smaller and smarter wings....May 04, 2016 | 
|  | This week our team drew a 3-view drawing of the plane we intend to make. Firstly, we determined...April 27, 2016 | 
|  | Last week, we decided to change the shape of the wing. So, in this week, firstly, we revised ...July 13, 2016 | 
|  | In this week, we conducted the first flight test. In advance, we prepared a giant box made of ...July 13, 2016 | 
|  | This week our team finished making the plane. We attached electrical components to the body of t...July 06, 2016 | 
|  | In this week, we finished an estimation of the center of gravity of the aircraft and making wheel...June 30, 2016 | 
|  | Outline of this week’s activity is that we completed to make a main wing and set about making whe...June 22, 2016 | 
|  | This week we made progress especially in making the main wing. We had prepared the front and rear...June 15, 2016 | 
|  | Summary of this week In this week, we continued making our plane. We cut and bended wood sticks ...June 09, 2016 | 
|  | In this week, we started to produce the plane we design. First of all, we prepared full-sized blu...June 01, 2016 | 
|  | In this week, we prepared to actually make our plane. In this week’s class, we learned how to us...May 25, 2016 | 
|  | First, we revised the early drawing and review the structural drawing concerning how should we a...May 18, 2016 | 
|  | In this week, we almost completed the primary 3-view drawing of our project. We had been pointed ...May 11, 2016 | 
|  | [Summary of a weekly work] First we learned how to use CATIA, one computer-aided design softwar...May 04, 2016 | 
|  | In this week, our team discussed the concepts of our plane, and made the initial three-view drawi...April 27, 2016 | 
|  | On Wednesday in last week, we had the last flight test in Gotenshita Gym. In the former flight te...July 13, 2016 | 
|  | This week we completed our aircraft and committed a flying test. And the result was fortunately ...July 13, 2016 | 
|  | This week, we finished making electrical parts, strengthening the bond between body and the main...July 06, 2016 | 
|  | This week, we finished constructing the main wing. We completed making the flame of the wing and ...June 30, 2016 | 
|  | In this week, our team's wing was approaching complication. We finished making its frame, decidin...June 30, 2016 | 
|  | This week we made the frames of main wings with wood. Firstly we used 3D CAD called Autodesk Inve...June 15, 2016 | 
|  | After the 8th lecture, we only finished making frames of a fin and elevons. It seemed to take muc...June 09, 2016 | 
|  | Last week we started to construct our airframe. We made a rudder of a vertical tail and two ailer...June 01, 2016 | 
|  | In this week, we drew the exact size drawing of building a vertical tail and elevons. Following a...May 25, 2016 | 
|  | Our main tasks of this week are an improvement of airfoil shapes and drawing a plan in conside...May 18, 2016 | 
|  | This week, our team converted the policy of the designing our robot. We were going to make a fl...May 11, 2016 | 
|  | After the 3rd lecture, we took many technical advice on our plane’s design from teaching assistan...May 04, 2016 | 
|  | We started only this one concept paper. The concept we had in common is to create unique and cool...April 26, 2016 | 
|  | [Summary of a weekly work] This week we tested our aircraft for the 2nd time and made a presenta...July 13, 2016 | 
|  | Achievements As a whole, the flying of our aircraft is very stable. No big problems happened. Ou...July 13, 2016 | 
|  | [Summary of a weekly work] This week, we completed making the airplane. In detail, we attached...July 06, 2016 | 
|  | This week our team have accomplished two big tasks. One task was an improvement of main wings. Al...June 30, 2016 | 
|  | In this week, we succeeded in achieving 2 main points. First we connected the body of flying robo...June 22, 2016 | 
|  | [Summary of a weekly work] This week, we made a tailplane and a main wing, consulting the figure...June 15, 2016 | 
|  | Last week, we 4 members finished the mid-term examinations well. So we moved to put much emphasis...June 09, 2016 | 
|  | This week our team have made a framework of the vertical tail. Last week we had made 3D models of...May 30, 2016 | 
|  | This week our team has made 3D models of some parts of SAKURA. To cut a board with a laser cutter...May 25, 2016 | 
|  | In this week, we improved the drawing to some degree. We had been pointed out that our sketch had...May 18, 2016 | 
|  | [Summary of a weekly work] This week, we drew a 3-view drawing, consulting the primary 3-view dr...May 11, 2016 | 
|  | [Summary] This week, we upgraded previous data, and calculated various elements about our airpl...May 25, 2016 | 
|  | [Summary of a weekly work] This week, we decided various elements about our airplane, and we cr...April 27, 2016 | 
|  | In the first test flight last week, our plane “Alpha” flied for sure. However, the main wing twi...July 13, 2016 | 
|  | We conducted the 1st test flight this week. We were nervous that “Alpha” could not fly, but it ce...July 13, 2016 | 
|  | This week, we have finally completed crafting the first version of our plane and prepared a case ...July 06, 2016 | 
|  | Last week, we moved on to the first phase of the final step. Firstly, we attached the main wing ...June 30, 2016 | 
|  | We assembled the right wing and the left wing and the center rib. We also assembled the center ri...June 22, 2016 | 
|  | This week, we succeeded in crafting frames of a main wing and ailerons. Last week, we realized th...June 15, 2016 | 
|  | This week, we had planned to start crafting the main wing. However, one of the team members who h...June 07, 2016 | 
|  | In the last class, we at last began making the plane, the main process of the course. The first ...June 01, 2016 | 
|  | We were lectured how to use the laser cutter and the flight simulator, and how to cut and assembl...May 25, 2016 | 
|  | Last week, after the teaching assistants explained the details of each parts, we had a free time...May 18, 2016 | 
|  | Since we had several holidays this week, we did not have classes. Despite that, thanks to the TA ...May 11, 2016 | 
|  | This week, we mainly discussed a 3-view drawing and submitted the amendment of the drawing. Last ...May 04, 2016 | 
|  | Our goal of this week was to complete the first 3-view drawing. In order to accomplish this, we n...April 27, 2016 | 
|  | 2016S Semester 2nd 4/13 Today, we began the 2nd session of our project. Today’s theme was conc...April 13, 2016 | 
|  | Flying Robot Project for the 2016 summer semester has started. We staff members have been continu...April 06, 2016 | 
|  | We had our second test flight in the same gymnasium. In our last test flight, we noticed that th...January 25, 2016 | 
|  | 2015 winter semester team (VTOL aircraft team) It’s a second time Flight test today. Using two...January 25, 2016 | 
|  | We had our first test flight this day. We went to a civic gymnasium near our university. We achi...January 20, 2016 | 
|  | 1回目の飛行試験を行った。 飛行試験でははじめに通常の固定翼機として飛行させ、成功した。 また、マルチコプター用のローターを姿勢制御なしで作動させ揚力が十分に発生することを確認した。 さら...January 20, 2016 | 
|  | Happy New Year!! This was our first meeting of the year. Today, we tried to integrate the system...January 06, 2016 | 
|  | This week, principally, we made electric wiring with soldering. Moreover, we put forth motor full...January 06, 2016 | 
|  | We started to integrate our system. On the quad copter, we will place two microcomputers. One of ...December 16, 2015 | 
|  | Almost the airframe assembling is completed by the class of this week. We’re going to wire motor...December 16, 2015 | 
|  | We kept on working to keep aircraft maintain designated altitude. The vibration is getting smalle...December 09, 2015 | 
|  | For the reason that the 3D printer that belongs to the Flying robot project was out of order, we ...December 09, 2015 | 
|  | We started to work on our automated control system of the quad copter. We will program the microc...December 02, 2015 | 
|  | This week, we attempted to make joint components with 3D printer. However, 3D printer didn’t work...December 02, 2015 | 
|  | We kept on working to make our aircraft fly stably. We changed the microcomputer of the aircraft ...November 25, 2015 | 
|  | Last Friday, we made frame of the tail wing and cut members of the main wing, so we continued c...November 25, 2015 | 
|  | There is a laboratory that works on quad copter in the department of aeronautics and astronautics...November 18, 2015 | 
|  | We made the center rib and wing-body junction with a laser cutter, and readjust them. In paralle...November 18, 2015 | 
|  | This week we worked on adjusting the control system. We are using a PID controller to control pit...November 11, 2015 | 
|  | We tried to cut out some parts of the plane which we designed using 3dCAD based on the result of ...November 11, 2015 | 
|  | Hello, this is the quad copter team. Our team name is i-Pochi, as our goal is to make an aircraft...November 04, 2015 | 
|  | We were not clear on our allocation of tasks, so we were not able to work efficiently. So in the ...November 04, 2015 | 
|  | The Contest was finished. Unfortunately, the result is the 3rd place. However, we are satisfied w...September 30, 2015 | 
|  | Taking the results of the last test flight at the Ota-City General Gymnasium, we changed the desi...September 24, 2015 | 
|  | We conducted test flights at Ota-City General Gymnasium where the Contest will be held. Because o...September 18, 2015 | 
|  | We diverted the main components from the 2nd airfoil to the 3rd airfoil and make new propeller gu...September 08, 2015 | 
|  | We conducted test flight and practice for the contest. Our multicopter flew successfully without...September 02, 2015 | 
|  | Assemble of our multicopter has completed. The following lists are specs; Material: aviation pl...August 21, 2015 | 
|  | We have started to assemble our multicopter version 2. We don't use multiwii for version 2 multi...August 10, 2015 | 
|  | We used press fitting as a new attaching method of the propellers. The cause of instability and f...August 06, 2015 | 
|  | We installed new motors we ordered last week, and furthermore, we made test flights. We found tha...July 31, 2015 | 
|  | We had a meeting for the contest since we finished examinations and reports. The cause of instabi...July 24, 2015 | 
|  | The result is that we were 9th place in the competition and 1st place in the poster session. Abou...September 28, 2015 | 
|  | On September 27th, the final day of the Flying Robot Contest, we were 9th place in the final roun...September 27, 2015 | 
|  | On September 26th, the second day of the Flying Robot Contest, we got passed the preliminary roun...September 26, 2015 | 
|  | On September 25th, a first day of the Flying Robot Contest, we helped the site management, displa...September 25, 2015 | 
|  | In the contest, we get points if the plane collects magnet locks with ribbon and comes back to a ...September 23, 2015 | 
|  | On September 16th, we found that our airplane’s airfoil was not good. Clark Y is adopted for the...September 16, 2015 | 
|  | When we made experimental flight a few days ago, our plane failed to turn somersault and then cra...September 09, 2015 | 
|  | In the contest, chicken ramen mini will be used as relief supplies. On September 2nd, we made a r...September 02, 2015 | 
|  | On August 26th, firstly, we made wing-body junction slim and easy to attach and detach. Specifica...August 26, 2015 | 
|  | In the contest, we have to load relief supplies and payload on the plane, so body weight will be ...August 18, 2015 | 
|  | 1 team per university can participate in the general category of the Flying Robot Contest which w...August 11, 2015 | 
|  | In the test flight which was held on July 28th, our plane tended to turn left with no operation. ...August 03, 2015 | 
|  | We tested our plane in flight at Edogawabashi gymnasium. Our main aim this time was improvement o...July 28, 2015 | 
|  | On July 24th, we made improvements on fixing method for main landing gears because in the test fl...July 24, 2015 | 
|  | We made a final result presentation on July 15, 2015. In the presentation, we reported about the...July 15, 2015 | 
|  | This week , based on the result of the previous flight test , we discuss the future of the policy...July 08, 2015 | 
|  | I will talk about the 3rd test flight on July 6. In the 2nd test flight, we adjusted gain paramet...July 06, 2015 | 
|  | This week, we made experimental flights of the 1st prototype. The phenomenon that crashed immedia...July 01, 2015 | 
|  | Today, we checked operation of control board of qurdcopter. First we checked that the controller ...June 24, 2015 | 
|  | In today’s activity, we cut a frame and stiffening ribs of 2nd prototype by laser cutter. It is...June 22, 2015 | 
|  | In today’s activity, we continued to assemble the 1st airframe. As the solution of the last week’...June 10, 2015 | 
|  | Today, we have started to assemble the first airframe. Its structure is so simple that we could b...June 03, 2015 | 
|  | Today, we will describe the action policy of team F. At the beginning of May, we draw up a plan a...May 27, 2015 | 
|  | Weekly report from team F. We all work on this project for winning the Flying Robot contest in t...May 20, 2015 | 
|  | On July 15th, the result presentation meeting was held. We explained the concept of our plane and...July 15, 2015 | 
|  | After the flight test, we held a meeting and evaluated our plane. Summary of opinions are shown b...July 08, 2015 | 
|  | On July 6th we did the flight test, but the plane did not fly. Negative pitching moment was too...July 06, 2015 | 
|  | Finally, we finished making the plane. At the final stage of crafting, there were some problems s...July 01, 2015 | 
|  | A big mistake in the drawing of the wing was discovered, so we decided to remake the wing from al...June 24, 2015 | 
|  | On June 17th, we pasted paper sheets on the frame of elevon, rudder and vertical stabilizer, and ...June 17, 2015 | 
|  | This week, we created the frames of elevon and vertical stabilizer. We placed one balsa wood on e...June 10, 2015 | 
|  | First, we learned processing method of materials and moving method of electrical system. And then...June 03, 2015 | 
|  | Today a problem of design was pointed out. The number of beams placed near the center of the wing...May 27, 2015 | 
|  | This is the first report from team E. From last week we have started designing our airplane, but ...May 20, 2015 | 
|  | We had the presentation meeting today. Each team gave a presentation about their activity in this...July 15, 2015 | 
|  | Having finished our test fly, we are now going forward to a presentation held next week, which i...July 08, 2015 | 
|  | On July 6, 2015, we finally examined our planes in a gym nearby. Battery loaded and the main wing...July 06, 2015 | 
|  | We have managed to unite the left and right main wings, stretch a string amongst the main wing i...July 01, 2015 | 
|  | We finally completed the main wings on Friday 26 June. As is the same situation since last few we...June 24, 2015 | 
|  | Project has been delayed. According to the first plan, the frame of the main wing should be compl...June 17, 2015 | 
|  | Intensive construction of the plane has begun. We are to show the completed aircraft on July 6th ...June 10, 2015 | 
|  | We started building the plane this week. Working place has changed from a classroom to the factor...June 03, 2015 | 
|  | Last week we submitted secondary three-plane drawings in which specification was much more detail...May 27, 2015 | 
|  | Weekly report from team D. There held on May 20th the presentations about the first draft partic...May 20, 2015 | 
|  | Weekly report from team C. On July 15th, the result briefing was held. We explained our comple...July 15, 2015 | 
|  | Weekly report from team C. On July 8th, we looked back on a sequence of activities. Certain me...July 08, 2015 | 
|  | On July 6th, we tested our plane in flight at Bunkyo general gymnasium. It had no problem about ...July 06, 2015 | 
|  | Weekly report from team C. On July 1st, we soldered electrical equipment together, then confor...July 01, 2015 | 
|  | Weekly report from team C. On June 24th, we made connecting structure of wheel and rib with pi...June 24, 2015 | 
|  | On June 17th, we pasted sheets of paper on the frameworks of vertical stabilizer, horizontal sta...June 17, 2015 | 
|  | Weekly report from team C. On June 10th, we processed sheets of balsawood into the main spar, ...June 10, 2015 | 
|  | Weekly report from team C. On June 3rd, we learned how to process balsawood into wing and how ...June 03, 2015 | 
|  | Weekly report from team C. On May 27th, we gave a presentation on a structural drawing about o...May 27, 2015 | 
|  | Weekly report from team C. On May 20th, we gave a presentation on a three view rough drawing abou...May 20, 2015 | 
|  | Weekly report from team B. As today's class was the final class of the semester, each group did a...July 15, 2015 | 
|  | Weekly report from team B. Today was a clean-up day. After cleaning up our workspace, there were ...July 08, 2015 | 
|  | Weekly report from team B. Today was the day of test flight. First thing we had to do was to carr...July 06, 2015 | 
|  | Weekly report from team B. The first thing we did this week was to finish the work on the wing. W...July 01, 2015 | 
|  | Weekly report from team B. This week, we managed to finish the construction of the wing for the m...June 24, 2015 | 
|  | Weekly report from team B. Our goals this week were to cut out the ribs for the wing, and to star...June 17, 2015 | 
|  | Weekly report from team B. We continued to work on the tailplane and the vertical tail during the...June 10, 2015 | 
|  | Weekly report from team B. We finally started making an airplane. We decided to begin crafting fr...June 03, 2015 | 
|  | Weekly report from team B. In this week's class, we presented our structural three-view drawing w...May 27, 2015 | 
|  | Weekly report from team B. What we did this week was to improve our basic airplane design based o...May 20, 2015 | 
|  | Weekly report from team A. We completed our entire project and gave a presentation. We reported t...July 15, 2015 | 
|  | Weekly report from team A. We finished the test of our plane on Monday. So We discussed what is w...July 08, 2015 | 
|  | Weekly report from team A. We brought our plane to Bunkyo Sougou Taiikukan (Bunkyo General Gym), ...July 06, 2015 | 
|  | Weekly report from team A. At last we have finished manufacturing the aircraft. Thanks to help fr...July 01, 2015 | 
|  | Weekly report from team A. We have already made a vertical tail assembly, a horizontal tail assem...June 24, 2015 | 
|  | Weekly report from team A. The tail wings flame had been completed last week, and we set about ma...June 16, 2015 | 
|  | Weekly report from team A. We have started a horizontal tail and vertical tail last week. First, ...June 10, 2015 | 
|  | Weekly report from team A. We’ve started making frames of our airplane. Before making them, we le...June 03, 2015 | 
|  | Weekly report from team A. What we’ve done this week is making the structure three-view drawing a...May 27, 2015 | 
|  | Weekly report from team A. We’ve started designing our airplane. Our concept is giving the suffic...May 20, 2015 | 
|  | Weekly report from team B, automatic controlling. Our airplane had successfully operated in auto...January 28, 2015 | 
|  | This is a report of B team’s first test flight. We completed our airplane composed of separately...January 27, 2015 | 
|  | Weekly report from team B, automatic controlling. We have been assembling our airclaft this week...January 14, 2015 | 
|  | Weekly report from team B(automatic controlling). This week we have presented our midterm report...January 07, 2015 | 
|  | This week, we gave a cut of the center rib and the wing ribs by laser cuter. In addition, because...December 17, 2014 | 
|  | Correcting and confirming structure design, we started to make the actual plane since last week. ...December 10, 2014 | 
|  | Weekly report from team B(automatic controlling). This week we have decided the concrete schedul...December 03, 2014 | 
|  | We prepared the structural three-dimensional figure until today and in the lecture, we gave a pre...November 26, 2014 | 
|  | Weakly report of the team aiming at automatic control. In this term, it has been clarified wha...November 19, 2014 | 
|  | The concept of B team is " challenging automatic control ", so we aim to make an airplane which ...November 12, 2014 | 
|  | Weekly report from team A, making a manned ornithopter. The first version of our airplane did no...January 14, 2015 | 
|  | Weekly report from team Ornithopter. Our team did a mid-term presentation this week. On December...January 07, 2014 | 
|  | Weekly report from team Ornithopter. We finished to put a wing surface. to make mounts on whic...December 17, 2014 | 
|  | Weekly report from team A. (Ornithopter) We completed the framework of the wing that had been ma...December 10, 2014 | 
|  | Weekly report from teamA,making a mannered ornithopter. This week we started to build a tail w...November 26, 2014 | 
|  | Weekly report from team A. This semester for the flying robot project, we have decided to make a...November 19, 2014 | 
|  | Weekly report from team Ornithopter. This week we mainly checked the operation of a motor conn...November 12, 2014 | 
|  | Finally, the contest day was coming. The flight test in the morning, we checked the flight path,...September 28, 2014 | 
|  | Weekly report from team BATMAN. We took part in the 10th Indoor Flying Robot Contest on Septembe...September 28, 2014 | 
|  | Today, we did the second flight test. Then we used the lighter battery because weight of our air...September 26, 2014 | 
|  | Weekly report from team BATMAN. This week we completed the final version of the aeroplane. As yo...September 23, 2014 | 
|  | We conducted two test flights. One was that we put five beanbags on our aircraft. The other one ...September 18, 2014 | 
|  | This week we created beanbags dropped equipment, ailerons and a collecting device. Effectiveness...September 16, 2014 | 
|  | Weekly report from team BATMAN. This week we did not make much progress. In this report, I wil...September 14, 2014 | 
|  | Weekly report from team BATMAN. We conducted the flight test on September 1st. In the test we...September 07, 2014 | 
|  | This week, we made a box for a carrying the SKIP UNIT 1. We chose the Styrofoam and plastic card...September 02, 2014 | 
|  | Weekly report from team BATMAN. This week we made the third version of main wing. The characte...August 30, 2014 | 
|  | Our airplane is named BATMAN. We completed the second version of the plane in this week. We in...August 21, 2014 | 
|  | This is the last report of this project as a class. Three teams have conducted their flight expe...July 16, 2014 | 
|  | This week each team worked on mounting electrical devices to their aircraft. Mainly there are fi...July 09, 2014 | 
|  | Our aircraft was named SKIP. We would like to introduce our aircraft, SKIP UNIT 1, which we crea...August 21, 2014 | 
|  | In this week, most of the teams have finished producing the frame of the wing, so they first fil...June 25, 2014 | 
|  | This week the teams continued the production of the main wings. Each team has different kind of c...June 18, 2014 | 
|  | This week the teams continued to make their airplanes. Most of the teams started to working on t...June 11, 2014 | 
|  | This week the teams finally began the actual production of the airplanes. The teams learned how ...June 04, 2014 | 
|  | This week each of the teams displayed their own aircraft’s structural 3 view drawing by explaini...May 28, 2014 | 
|  | This week, each of the team first presented their own design of airplane by showing initial 3 vi...May 21, 2014 | 
|  | This week, we were divided into three groups. These are the groups in which we are going to make...May 14, 2014 | 
|  | In this week session, from Teacher Tsuchiya, we received an explanation of the contest rules. Ac...May 07, 2014 | 
|  | In the middle of April, we’ve newly started the flying robot project, which aims to participate i...April 30, 2014 | 
|  | This time, we conducted the last flight test. Last time we conducted, the plane began vibrating w...March 28, 2014 | 
|  | This week, we wrote temporary version for the auto flying system and checked the program by using...January 16, 2014 | 
|  | After winter vacation, we managed to finish the codes for auto pilot and real time downlink. So, ...December 18, 2013 | 
|  | Last week, we tried to estimate the location and the attitude of the airplane using nine-axis acc...December 11, 2013 | 
|  | In this class, we reported the characteristics of the sensors and how we used them. We realized t...December 04, 2013 | 
|  | This week we asked Mr. Tsuchiya, who is an associate professor in the Aerospace Engineering facul...November 27, 2013 | 
|  | This week, we shared with one another what we did last week and decided the development objective...November 20, 2013 | 
|  | Last week, we bought Arduino, a micro computer which is widely used all over the world. As our ho...November 13, 2013 | 
|  | In the last term we made radio controlled indoor airplanes, took part in the competition and we w...November 06, 2013 | 
|  | In this week, we repaired the main wing of the air plane No.3 and made a new main wing. We did no...October 03, 2013 | 
|  | We held the fifth flight experimentation in September 30th. We experimented the airplane No.3 whi...September 30, 2013 | 
|  | The first airplane we made flew smoothly. However, there are two major problems. First of all, ma...September 30, 2013 | 
|  | In the last two weeks we were trying to make an improvement to the first unit. After the first fl...September 05, 2013 | 
|  | What we did last week are these. 1:Fix tail planes, main wings and servomoters to the rear part ...August 20, 2013 | 
|  | “Indoor airplane project” as the classwork of the university has finished. However, we continue t...August 11, 2013 | 
|  | This day was the last day of the class. For this class we successed to build the main and tail w...July 17, 2013 | 
|  | Today we prepared to make the wings of our model airplane. First, we cut all parts that are requ...July 10, 2013 | 
|  | We usually hold this class on Wednesday. However, we gathered this Monday to build our model plan...July 08, 2013 | 
|  | This week we prepared to laser-cut the parts and do the assembly. For this, we built the wing ca...July 03, 2013 | 
|  | We held test flights of radio-controlled airplane which we made few weeks ago. We had two purpose...July 01, 2013 | 
|  | In the last two weeks we drew the structural three-view drawing. First, we changed the size of t...June 26, 2013 | 
|  | In this week, we checked our design of the model plane in terms of aerodynamics and structural dy...June 12, 2013 | 
|  | This week we tried a destructive test on the main wing of the “Amembo”. The test was done by atta...June 05, 2013 | 
|  | This week, we took a lecture about strength of the structure of the main wing. We are planning to...May 29, 2013 | 
|  | Today we finished building the body of the model RC plane, and tested the motors and the RC syste...May 22, 2013 | 
|  | We continued making the radio-controlled airplane kit which we started making last week. On the l...May 15, 2013 | 
|  | In May 8, we started to build a light and high-performance RC-plane, which is a kit and already d...May 08, 2013 | 
|  | May 01, 2013 | 
|  | April 24, 2013 | 
|  | April 17, 2013 | 
|  | March 08, 2013 | 
|  | March 01, 2013 | 
|  | December 29, 2012 | 

      This page has the final presentation slides of each team. You can download them form the following URLs. 
Team A : https://drive.google.com/open?id=0B4PUde7OCrmWV2dPWUxHV1Eya0k
Team B : https://drive.google.com/open?id=0B4PUde7OCrmWTzZKV01sRC1RUG8
Team C : https://drive.google.com/open?id=0B4PUde7OCrmWOE1RZUJpNWsxMms
Team D : https://drive.google.com/open?id=0B4PUde7OCrmWRkxoU0F3X0lxaEU
Team E : https://drive.google.com/open?id=0B4PUde7OCrmWcURjb2lJQTBDMGc
Team F : https://drive.google.com/open?id=0B4PUde7OCrmWLWRzcVIyMS1Kc1U