REPORT

2024 Summer Semester Flying Robot Project Team E Article 2May 22, 2024

620

There were two main tasks. The first was to make mounts for joining the fuselage and wings. After making the mount out of MDF, I made a proper version out of veneer and confirmed that it would hold the spars firmly and allow us to change the angle of attack of the wings.
The second step was to make the left wing. After attaching flanges to the cut-out ribs, the web was attached, and finally 3mm styrene board was attached by bending it with a hairdryer. In the process of making the aileron, we confirmed that the aileron was free to move.
主に取り組んだことは二つ.一つ目は胴体と翼の接合用のマウント製作です.一度MDFで製作した後ベニヤで本番を作り,桁をしっかりと保持しつつ翼の迎角を変えれそうであることを確認しました.
二つ目は左翼の作成です.切り出したリブにフランジを付けたあと,ウェブを取付け,最後に3mmのスチレンボードをドライヤーで曲げながら取り付けました.また,その過程でエルロンを作成し,エルロンがフリーで動くことを確認しました.

|