REPORT

2015 summer semester team B 7thJuly 01, 2015

620

Weekly report from team B. The first thing we did this week was to finish the work on the wing. We completed the additional part on wing-body joint and put a film on the entire wing. At this point, we realized that the work on electrical components needed more time, and decided to glue the wings and the propeller (with a motor) onto the body carbon pipe. Meanwhile, we continued to work on the electrical components. Eventually we were able to complete works on the electrical constituents including soldering the parts and handling batteries. Now, we are glad that our airplane was completed before the date of test flight and looking forward to seeing the plane fly.

Science 1, College of Arts and Sciences
Go Yasui
今週は急ピッチで機体製作をすすめました。まず翼胴結合の部品を完成させ、主翼に膜を張りました。その後、残す作業を電装関連のみとするため胴体カーボンに主翼と尾翼をそれぞれ接合し、カーボンの先にはプロペラ(モーター)を接着しました。平行して電装関連の作業を進め、授業日の2日後にははんだ付けやバッテリー関連の作業を終え機体を完成させるに至りました。今はなんとか飛行試験日までに機体製作が終わり、ホッとしています。スタンダードなテーパー翼の機体なので、おそらく飛んでくれるのではないでしょうか。

教養学部前期課程理科一類
安井 豪

|