REPORT

2024 Summer Semester Flying Robot Project Team A Article 5June 12, 2024

620

On June 12, the fifth session, we assembled the part connecting the upper and lower wings to the main shaft and the upper wing. The part connecting the wing and the main shaft that was previously made was too heavy, so a new piece of balsa wood was cut out and fabricated. We plan to fabricate an inter-wing strut in the next session to maintain the rigidity of the wing. When assembling the upper wing, it was difficult to join the right and left wing spars in a straight line. The ailerons, inter-wing struts, and shafts will be fabricated in the subsequent weeks. 5回目となる6/12は、上下の翼と主軸をつなぐ部分と上翼の組み立てを行いました。以前製作した翼と主軸をつなげる部分が重すぎたため、新たにバルサ材を切り出し製作しました。次回以降に翼間支柱を製作し剛性を保つ予定です。また、上翼を組み立てる際、左右の翼の桁をまっすぐ接合するのに苦労しました。次回以降はエルロン、翼間支柱、軸まわりの製作を行います。

|